※ This information applies equally to both Korean and foreign makers.
✅ Period of Wadiz Project
We recommend that the Wadiz project be carried out for 20-25 days.
- Project duration can be set to a minimum of 7 days and a maximum of 60 days.
- However, it is important to set the appropriate period, as the progress period too short or too long can affect the supporter participation rate.
✅ Scheduled duration of Wadiz opening
It is recommended that the scheduled opening be held for about 10 days.
- The scheduled opening period can be set for a minimum of 7 days and a maximum of 24 days.
- If the period is too short, there is not enough opportunity to expose the project, and if it is too long, it is easy to distract the attention of the supporters.
- About 10 days is the period you can reach supporters most effectively.